Underground Diaphragm Wall Revamping Project

We are proud to announce the successful completion of another retrofit project. The XCMG450 Underground Diaphragm Wall Hydraulic Grab has been fully modernized, and our customer confirms: “It’s significantly more functional and reliable than the original system.” This is the first implementation of the system as a retrofit, and it is fully adaptable to serial production machines as well.
Intelligent operation
From intelligent mode management to multi-layered safety logic:
- Synchronized dual-drum winch operation
- Auto/manual hose drum lift logic (HDS)
- Load monitoring with override capabilities
- Dynamic transport mode configuration
- Grab alignment via live X/Y inclination feedback
- Depth-based excavation logic with real-time feedback adjustment
Monitoring and diagnostics
A field-ready integrated system developed by engineers who understand the operator’s world:
- Real-time hydraulic pressure and temperature monitoring
- Automatic RPM control and error fallback modes
- LED-based operational diagnostics
- DM1/DM2 fault screens
Project images
World-class quality meets Turkish engineering precision.


